This blog follows the progress of the addition being built on the West Perth Public Library in Mitchell, Ontario. When finished, the addition will almost double the public space and the entire building will be accessible with the inclusion of an elevator. West Perth Library is a Carnegie Library built in 1910.

Friday, May 23, 2008

Heading skyward

Framing of the second floor is now in progress.










Back wall against the parking lot is also in place and more blocks are in readiness to complete the elevator shaft.


Posted by West Perth Public Library at 5:59 PM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2008 (89)
    • ►  November (1)
    • ►  October (4)
    • ►  September (11)
    • ►  August (13)
    • ►  July (14)
    • ►  June (10)
    • ▼  May (19)
      • Skyjack-ing
      • Boarded up
      • Nothing to do with construction
      • Raising the roof
      • Mellow yellow
      • Lots to look at
      • Heading skyward
      • Another hole in the wall
      • Wall decorating
      • Shrinking workspace
      • We're being 'framed'
      • A floor to walk on
      • Framing has started
      • Cool pictures from beam placement day
      • Steel beams and posts in place
      • Picture of the picture-taker
      • Plaque presentation for Trillium Foundation funding
      • Rising block by block
      • Not exactly Lego blocks
    • ►  April (11)
    • ►  March (6)

About Me

West Perth Public Library
View my complete profile

West Perth Public Library Pre-Addition

Site Meter