Thursday, June 26, 2008

Almost complete roof



The roof is almost finished and the window frames are being installed.

Tuesday, June 24, 2008

Exciting times but not exciting pictures



With some sunny weather, the roof has come a long way. It is finished at the back....








.... on the side and the front is started.




This isn't an exciting picture to look at, but this is going to keep us comfortable in the library. The ductwork is being installed and wrapped in the attic space.
Also not exciting but so-o-o necessary. A new drain has been installed.

Thursday, June 19, 2008

Library shutdown week continues


In spite of the dull, drizzly weather, work has been progressing. The roof and dormer at the back of the library has its tile.







This is looking through the door into the back room, the tarp is gone. This will be the elevator stop on this floor of the library. The raised area beyond the elevator shaft is the program room which shares the same level with the children's section. The elevator will also make a stop at that level.



The electricians have been hard at work as shown by the wire running through the walls and hanging from the ceiling.

Tuesday, June 17, 2008

Library shutdown week

The library is shut down this week for the electricians and heating/cooling technicians to do their work. New lighting fixtures have been installed in the main library.










Looking through the door into the back room on the main floor behind the present circulation desk. There used to be a wall and a window there. The wall has been now been removed and the entrance to the elevator for this floor is on the other side of the tarp.







The roof on and around the back dormer has been strapped and the roofing tile is being put on.

Thursday, June 12, 2008

Stalked by a mummy


New walls have been framed downstairs to make the original bathroom wheelchair accessible and to create a new furnace room and elevator pump room. The contractor's office is situated in the elevator room for now with the mummy keeping an eye on them. The bathroom is down the short hall behind the elevator room.

Windows open downstairs


The window openings have been cut out on the lower floor. (Taken from future circulation area.) A part wall has been added below the windows. This allows wiring to be run without interference of the insulation.

Tuesday, June 10, 2008

Matching points



Two views of the dormer that has been added to the front roofline, keeping in character of the original Carnegie library building.