Wednesday, July 9, 2008

Brick by brick by brick....

The brick on the front of the library is now up to the top of the second storey windows. We have had many comments on how the addition ties in beautifully with the original Carnegie library.








A large portion of the upstairs is drywalled. This is taken from the program room area looking into the children's area. The barrier-free washroom is in the right-hand corner.


Tuesday, July 8, 2008

More brick - red this time


The masons have made a good start at the front wall of the library in the heat and humidity.
The upstairs of the addition is now drywalled, but no picture is available.

Plastic all around



The upstairs is insulated and vapour-barriered in preparation for drywall.







Not a lot to see in this picture, but that's because the white block is covered with plastic to protect during the installation of the red brick - seen on the scaffold.

Friday, July 4, 2008

Brick and drywall




The ceiling and a bit of the walls have been drywalled downstairs. It's so bright!








The white brick has been finished along the side of the library.



More blocks



Installation of the white block has been completed on the front of the addition.

Industrious electricians


In our kitchen/staff room, the electricians have installed the outlets for a microwave, stove and fridge. What a lot of work since it was into the concrete block but thank you - we will be able to have something to eat on our breaks!

Thursday, July 3, 2008

Library is just a'hoppin


On Wednesday, the masonry crew started to install the white brick on the lower part of the library that matches the existing library. Everything is white in the vicinity from the dust from cutting the blocks.






Insulation has been installed in between the studs in the walls in the lower level. It's hard to see, but grey insulation has also been inserted into the ceiling between the floor joists to provide sound-proofing between the two levels.





Piles of drywall are ready and waiting upstairs.









The frame for the new entrance door is in place.