Wednesday, August 13, 2008

Masonry crew on the home stretch

The elevator doors have been propped open and the masons are back on the scene installing the blocks around the elevator door openings on each floor.












In the entrance way, one wall is being prepared for the insertion of the original 1910 medallion that graced the dormer in the south wall.







The brick has been evenly cut in preparation for capping the dormer.






The wall over the entrance way is now bricked.








The circulation area has been painted tan with Caroline's office painted a calming, ferny green. Some days we need all the calming we can get!