The front dormer has been finished by capping.










The HVAC system is coming along. The airconditioning units have been installed outside.





The fence has been removed from the front of the addition and the ground is leveled out.







The sidewalk in front of the addition has been replaced due to the wear and tear of big trucks (remember the cement trucks?)






Soffit and fascia are being applied to the eaves.







The entrance doors have been hung.











The foyer and stairs have been tiled. As well, the accessible bathroom upstairs, the kitchen and the emergency exit have been tiled.




The grid has been installed to hang the suspended ceiling in the downstairs of the addition.
Windows have been installed around the circulation area. They'll help keep us out of the draft, but give us a good view of the entrance.