Behind the scenes, the router box that contains all the technology for the connectivity of the library has been moved in the mechanical room to make way for new furnaces. The downstairs ductwork is continuing to be installed. The librarians with the help of a designer have been hard at work planning the layout of the circulation area. Upstairs, the mudding and sanding of the drywall is almost complete.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment