Thursday, July 3, 2008

Library is just a'hoppin


On Wednesday, the masonry crew started to install the white brick on the lower part of the library that matches the existing library. Everything is white in the vicinity from the dust from cutting the blocks.






Insulation has been installed in between the studs in the walls in the lower level. It's hard to see, but grey insulation has also been inserted into the ceiling between the floor joists to provide sound-proofing between the two levels.





Piles of drywall are ready and waiting upstairs.









The frame for the new entrance door is in place.