Thursday, June 19, 2008

Library shutdown week continues


In spite of the dull, drizzly weather, work has been progressing. The roof and dormer at the back of the library has its tile.







This is looking through the door into the back room, the tarp is gone. This will be the elevator stop on this floor of the library. The raised area beyond the elevator shaft is the program room which shares the same level with the children's section. The elevator will also make a stop at that level.



The electricians have been hard at work as shown by the wire running through the walls and hanging from the ceiling.