Thursday, June 26, 2008
Tuesday, June 24, 2008
Exciting times but not exciting pictures
Thursday, June 19, 2008
Library shutdown week continues
In spite of the dull, drizzly weather, work has been progressing. The roof and dormer at the back of the library has its tile.
This is looking through the door into the back room, the tarp is gone. This will be the elevator stop on this floor of the library. The raised area beyond the elevator shaft is the program room which shares the same level with the children's section. The elevator will also make a stop at that level.
The electricians have been hard at work as shown by the wire running through the walls and hanging from the ceiling.
Tuesday, June 17, 2008
Library shutdown week
The library is shut down this week for the electricians and heating/cooling technicians to do their work. New lighting fixtures have been installed in the main library.
Looking through the door into the back room on the main floor behind the present circulation desk. There used to be a wall and a window there. The wall has been now been removed and the entrance to the elevator for this floor is on the other side of the tarp.
Looking through the door into the back room on the main floor behind the present circulation desk. There used to be a wall and a window there. The wall has been now been removed and the entrance to the elevator for this floor is on the other side of the tarp.
The roof on and around the back dormer has been strapped and the roofing tile is being put on.
Thursday, June 12, 2008
Stalked by a mummy
New walls have been framed downstairs to make the original bathroom wheelchair accessible and to create a new furnace room and elevator pump room. The contractor's office is situated in the elevator room for now with the mummy keeping an eye on them. The bathroom is down the short hall behind the elevator room.
Windows open downstairs
Tuesday, June 10, 2008
Matching points
Two views of the dormer that has been added to the front roofline, keeping in character of the original Carnegie library building.
Sunday, June 8, 2008
Our ivory tower
A dormer has been added to the roofline at the back of the library. The roofing tile has been started on the addition.
Over the new entrance and tucked away behind the program room on the second floor is a kitchen that will double as a staff room. We're excited to finally have a staff room. I call this the window of our ivory tower.
Over the new entrance and tucked away behind the program room on the second floor is a kitchen that will double as a staff room. We're excited to finally have a staff room. I call this the window of our ivory tower.
Friday, June 6, 2008
Tour the downstairs
Caroline now has visual confirmation of her office. It is framed in behind the circulation area.
With my back to her office and standing at the (future) circulation desk, this is what we see looking across the addition.
Now, I've turned a bit to the right and we're looking at the wall that was removed into the former picture book room. At the back of the picture book room is the downstairs temporary wall.
Now, I've walked out in front of the circulation desk and turned to the right again to see the elevator shaft and the steps from the entrance.
Thursday, June 5, 2008
Stepping up