Wednesday, May 28, 2008

Mellow yellow


After sweating it out in the heat and humidity on Monday, the crew had to contend with very cool temperatures and strong winds on Tuesday. The elevator shaft was being worked on (no picture of that since the crew wasn't graced with the presence of the pink hard hat) and the roof is being replaced on the original structure. This shows the fire resistant board that has been installed on the steel support framing on the south side.