Forms were in place and the steps from the ground-level entrance to the lower floor were poured today. No more climbing down or walking down a ramp. The elevator will be accessed from the landing.
Tuesday, April 22, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment